Introduction to Beijing Gel Patch Coating Machine Knowledge Points
Release time:
2020-12-11
1. Non-adhesive paper, non-woven fabric hanging device. Composed of a hanging bracket, optical axis, and paper holder. Adjustment: Calculate the distance between the two supports to ensure the fabric paper is centered when hanging.
Beijing Gel Patch Coating MachineMain Structure
1. Non-adhesive paper, non-woven fabric hanging device.
Consists of hanging bracket, optical axis, and paper holder. Adjustment: Calculate the distance between the two supports to center the fabric.
2. Heating device.
Upper shaft, lower shaft, feeding, with constant temperature heating device. Adjustment: Adjusted by the temperature control instrument's up and down keys.
3. Traction device.
Traction is controlled by a 180W stepless speed motor, with active and passive traction modes. Adjustment method: By adjusting the M8 top screw, fix the anti-adhesive paper and non-woven fabric between the four must-be-centered traction wheels.
4. Adjust the thickness of the thinner coating.
Adjust the axis of the M8 upper and lower pressure shafts to adjust the thin wall thickness.
5. Adjust the coating width;
Adjust the control panel of the feeding hopper to adjust the coating width;
Maintenance of Beijing Gel Patch Coating Machine.
1. Regularly lubricate the traction motor chain.
2. Regularly check temperature control.
3. Check the adjustment top screws of the main traction drive and the driven traction drive.
Beijing Gel Patch Coating Machine Work Manual
Preparation for the first task.
1. Hang the anti-adhesive paper (must be centered, smooth surface, and cannot be sticky)
2. Hang the non-woven fabric (must be centered, hair down, easy to stick, meets requirements)
3. Install the anti-adhesive paper and non-woven fabric between the four drag wheels, and it must be centered.
4. Start the motor traction test and check the traction status of the motor.
5. Turn on the heating temperature controller and check the temperature.
6. Check if the fan is cooling when starting.
7. Adjust the thickness of the shaft according to the thickness of the adhesive.
8. Adjust the coating width.
Note: The above operations must be performed when not heated.
When reused, the two sets of temperature controls must be preheated to soften the residual matrix before use. Starting the cold machine can cause the anti-adhesive paper to break.
Precautions for Beijing Gel Patch Coating Machine:
1. Avoid pressing the shaft during operation to prevent burns.
2. When die-cutting, do not reach into the middle of the pressure shaft to avoid accidents.
3. Do not put your hands in the mixer.
4. Control the traction speed to avoid tearing the anti-adhesive paper.
5. When a fault is found, first press "Emergency Stop", cut off the power, and it is strictly forbidden to repair while powered.
6. Do not pour iron and foreign objects into the matrix.
7. If the anti-adhesive paper tears, stop the machine and wipe with heating oil.
Thank you all for patiently reading the article shared by the editor of Beijing Gel Patch Coating Machine. If you need to know more about Beijing Gel Patch Coating Machine and crystal mask coating machine, please feel free to contact us. Xinyi Huida is at your service 24 hours a day!
Related Information
Beijing XinyiHuida Electromechanical
E-mail: xinyihuida@163.com
Mobile: +86-13911770565 Mr. Lin (General Manager)
Address: 415, 4th Floor, No.2 Jinguangnan Street, Jinguangnan Street, Xilu Street, Fangshan District, Beijing
Product Category
Copyright© Beijing XinyiHuida Electromechanical Equipment Co., Ltd